研究目的
To calculate various parameters like performance ratio, plant capacity utilization ratio for two 20KWp grid connected rooftop power plants in Telangana state and to analyze power quality issues on roof top grid tied system.
研究成果
The study found that both plants operate within standard values for capacity utilization factor and performance ratio. The performance ratio of the project centre plant is higher than the training centre plant, except during winter due to shading effects. The overall system loss indicates good performance of the plants.
研究不足
The study is limited to two 20KWp grid connected rooftop power plants in Telangana state, and the analysis does not cover all potential power quality issues.